Drain pre.
Metal roof deck edge detail.
Eter support of the deck is necessary to limit edge deflection in the.
Drain post target.
At the gable edge use a gable or sidewall flashing.
Concealed wood equipment support.
Eave detail w gutter 1.
Cellular deck is made by attaching a bottom steel sheet to a roof deck or composite floor deck panel.
Skip to main content shop.
Edge form pour stop.
Roof pitch the metal roofing panels shown in this manual require a mini.
Cover strip end lap.
Download free high quality cad drawings blocks and details of metal decking organized by masterformat.
Pac snap edge extended fascia.
Fd12 roof top pipe roller support detail fd13 structural roof deck penetration detail fd14 metal covered expansion joint detail fd15 premanufactured expansion joint detail fd16 roof area divider detail fd17 raised metal roof edge detail fd18 gravel stop metal roof edge detail fd19 post supported roof deck flashing detail fd20 wall supported.
These sizes are available for immediate pick up or delivery.
Also for exposed fastener panels wall panels tiles soffit fascia copping.
The details and written instructions described in this manual are suggested installation methods to.
These formed galvanized angles are used to create a stopping point for poured concrete.
Curb type tie in at flat roof.
Conical pipe boot non split.
Coated metal joint detail.
To provide a drip edge allow an overhang of 1 to 2 inches at the eave.
Metal roofing specifications cad pdf drawings testing bim.
Roof deck is typically installed to endlap approximately 2 over supports.
Eave detail w gutter 2.
Change of deck plane.
Coated metal roof edge.
At the gable edge use a gable or sidewall flashing.
Just email your materials list for a quote.
Cellular deck can be used.
Edge form and pour stop for metal deck can be fabricated to custom sizes and gauges.
The trim and roofing sheet should be fastened every 12 to 24 inches along the gable edge.
However it can be butted or lapped more than 2 to.
Case studies white papers.
Conical pipe boot split.
Cad details document name pdf dwg download all cad construction details 37 1 mb 3 4 mb mc01 identification of roof areas 694 kb 167 kb mc01a single layer underlayment 678 kb 302 kb mc01b double layer underlayment 711 kb 322 kb mc02 vent pipe flashing 626 kb 349 kb mc03 valley.
Request a quote today.
Girts and roof deck the substructure to which the metal panels are fastened must.