No more leaking or seized cleanout plugs our exclusive gas tight gasketed brass plugs hold for testing and are easily removed and replaced.
Plumbing floor cleanout covers.
8130 floor grade cleanout.
8200 floor grade cleanout.
Cleanout covers cover plates and seals 49 drain grates grids and strainers 99 drain plate 4 drain stoppers 3 escutcheons and flanges 17 extensions tailpieces and tubes 60 floor drain 1 nuts and washers 10 p trap 6 pipe and valve covers 2 s trap 3 sink drain 1 sink drain components 2 tub and sink accessories 8.
Snap in fush fit cleanout with plastic plug view dimensions.
Tightly seal clean out fitting openings regardless of thread conditions permanently or temporarily.
8300 round cleanout access.
You need permanent easy access to all your you need permanent easy access to all your building control systems electrical junction boxes plumbing cleanouts air vent dampers etc.
Cleanouts access covers.
An approved two way cleanout is allowed to be used at this location to serve as a required cleanout for both the building drain and building sewer.
All plastic threaded cleanout cover only fits atc209 above view dimensions.
Easily tightened with a 5 32 allen wrench not included these expansion cleanout covers create a positive seal with the help of strategically positioned sealing ridges 3 embedded o rings and a 3 16 neoprene gasket.
8302 square hinged cleanout access.
Ferguson is the 1 us plumbing supply company and a top distributor of hvac parts waterworks supplies and mro products.
Especially useful for threaded fittings that have been corroded over time.
Floor drains channels trench watts cleanouts create an access point for piping inspection and maintenance.
All plastic abs cleanout with cover fits inside 3 sch 40 pipe and over 2 sch 40 pipe view dimensions.
8000 floor grade cleanout.
Zurn co2450 pv4 adjustable floor cleanout 4 inch pvc hub connection brass.
The cleanout at the junction of the building.
6000 floor grade cleanout.
A cleanout located inside the building may be inside a wall or floor.
8050 floor grade cleanout.
Cleanouts are usually in the drain where there is a 90 degree turn and positioned in such a way that when you remove the cap you can easily work on the blockage.
Our innovative round drywall ceiling wall access panel solves 2 key access panel problems with one ingenious circular design.
The cleanout shall be either inside or outside the building wall and shall be brought up to the finished ground level or to the basement floor level.
A cleanout may be easily accessible in buildings that have a crawlspace or a basement.
2 x 3 20 12.